• image2

    Sheet Piling and Strutting Works

    MRT Circle Line Project C821, C825, C421, C855, C825, C424, C423, LT143, LT134 and etc. It is also an active temporary works contractor in various LTA and private projects.

  • image2

    SHEET PILING AND
    DECKING WORKS

    Steel sheet piles are widely used as a quick and economical material to form earth retaining wall, both temporary and permanent. It can be installed, or rather driven into the ground by acomprehensive range of piling equipments. One of the most environmental friendly machines, silent and vibrationless, is known as Silent Piler.

  • image2

    Sheet Piling Works

    Leading temporary works contractor for design, sheetpile, soldier pile, pre-broring, strutting and access platform works. It is also a specialist temporary earth retaining wall contractor capable of contracting projects from soldier pile, sheetpile and grout-mix pile earth retaining system and internal support system such as shotcrete, ground anchor and strutting system.

  • image2

    Soldier Pile with Steel Plate Lagging

    LPUB drainage works for International Rd, HDB projects Canberra Links at Sembawang Rd and PUB Deep Tunnel Sewerage System Works at Defu Lane for Contract 1 and PUB Deep Tunnel Sewerage System at Tampines Rd Contract 2..

  • image2

    Pre-Auguring works

    Industrial construction, though a relatively small part of the entire construction industry, is a very important component. Owners of these projects are usually large, for-profit, industrial corporations. These corporations can be found in such industries as Infrastructure, Power Transmission & Distribution, metallurgical and material handling, medicine, petroleum, chemical, power generation, manufacturing etc.

  • image2

    Strutting Works

    MRT Circle Line Project C821, C825, C421, C855, C825, C424, C423, LT143, LT134 and etc. It is also an active temporary works contractor in various LTA and private projects.

.